SH 109 ML over DRAW

2.7 MI NORTH OF LA JUNTA · County 089, Colorado · Built 1943 · 2 Lanes · 2,300 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
5
Fair
Substructure
4
Poor

Bridge Details

Structure #
L-22-V
Year Built
1943
Length
7.3 m (24 ft)
Max Span
3.2 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
2,300
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,044,000
Total Project Cost
$1,148,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.