I 25 ML SBND over MUDDY CREEK

5.3 MI N OF JCT SH 165 · County 101, Colorado · Built 1965 · 2 Lanes · 7,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
L-18-CB
Year Built
1965
Length
31.4 m (103 ft)
Max Span
11 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
7,500
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.