I 25 ML SBND over CF+I WATER LINES

S Edge of Pueblo · County 101, Colorado · Built 1963 · 2 Lanes · 7,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
L-18-AY
Year Built
1963
Length
56.2 m (184.4 ft)
Max Span
18.3 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
7,500
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$227,000
Total Project Cost
$340,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.