SH 78 ML over DRAW
12 MI. SW. OF PUEBLO · County 101, Colorado · Built 1958 · 2 Lanes · 1,500 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
38.124339, -104.853689
This bridge is in worse condition than 70.2% of bridges in County 101. The average bridge in Colorado is 0 years old; this one is 68 years old.
Nearby Bridges
CR227/Bergemann RD over SALT CREEK
Built 1996
CR 230/3R RD over N. FORK ST.CHARLES RIVER
Built 1991
CR 230/BURNT MILL over DRY WASH
Built 1990
COUNTY ROAD 221 over DRY WASH
Built 1988
CR 230/BURNT MILL over ST. CHARLES RIVER
Built 1988
CR 230/BURNT MILL over ST. CHARLES FLOOD DITCH
Built 1990
CR230/BRNT MILL RD over DRY WASH
Built 1990
SH 78 ML over NORTH ST CHARLES RIVER
Built 2008
CR 201/SILOAM RD over PECK CREEK
Built 1991
County Road 3-R over TRIB. ST. CHARLES RIVER
Built 1988
Bridge Details
- Structure #
- L-17-F
- Year Built
- 1958
- Length
- 37.7 m (123.7 ft)
- Max Span
- 11.9 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 1,500
- Material
- Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.