SH 62 ML over UNCOMPAHGRE RIVER

IN RIDGWAY · County 091, Colorado · Built 2013 · 2 Lanes · 6,600 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
L-05-E
Year Built
2013
Length
38.3 m (125.7 ft)
Max Span
37.6 m
Width
18.1 m (59.4 ft)
Lanes
2
Daily Traffic
6,600
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$585,000
Total Project Cost
$877,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.