SH 145 ML over LEOPARD CREEK
JCT SH 62 - PLACERVILLE · County 113, Colorado · Built 2013 · 3 Lanes · 4,700 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
38.020194, -108.060775
This bridge is in worse condition than 23.7% of bridges in County 113. The average bridge in Colorado is 0 years old; this one is 13 years old.
Nearby Bridges
CR. 55R/GEYSER DR over SAN MIGUEL RIVER
Built 1989
Juniper Village Dr over San Miguel River
Built 2024
COUNTY ROAD 57P over SAN MIGUEL RIVER
Built 1987
COUNTY ROAD M44 over SAN MIGUEL RIVER
Built 1988
COUNTY ROAD 57P over FALL CREEK
Built 1994
COUNTY ROAD 56V over LEOPARD CREEK
Built 1993
COUNTY ROAD 56L over FALL CREEK
Built 1986
COUNTY ROAD 60M over SAN MIGUEL RIVER
Built 1988
COUNTY ROAD 57P over FALL CREEK
Built 1961
NO DATA ENTERED over FALL CREEK
Built 1987
Bridge Details
- Structure #
- L-04-H
- Year Built
- 2013
- Length
- 27 m (88.6 ft)
- Max Span
- 25.9 m
- Width
- 17.4 m (57.1 ft)
- Lanes
- 3
- Daily Traffic
- 4,700
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $377,000
- Total Project Cost
- $565,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.