SH 96 ML over RUSH CREEK
10.4 MI E OF JCT SH 287 · County 061, Colorado · Built 1988 · 2 Lanes · 430 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
38.434078, -102.553325
This bridge is in worse condition than 38.7% of bridges in County 061. The average bridge in Colorado is 0 years old; this one is 38 years old.
Bridge Details
- Structure #
- K-26-I
- Year Built
- 1988
- Length
- 78.3 m (256.9 ft)
- Max Span
- 25.5 m
- Width
- 12.3 m (40.4 ft)
- Lanes
- 2
- Daily Traffic
- 430
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.