US 50 ML EBND over DRY CREEK

IN PUEBLO 2 Mi E of I-25 · County 101, Colorado · Built 1958 · 2 Lanes · 3,850 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
K-18-BZ
Year Built
1958
Length
37.9 m (124.3 ft)
Max Span
9.1 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
3,850
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$445,000
Total Project Cost
$489,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.