COUNTY ROAD 415 over I 25 ML
6.4 MI S OF SH85-FOUNTAIN · County 041, Colorado · Built 1958 · 2 Lanes · 1,460 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
38.586492, -104.669317
This bridge is in worse condition than 60.7% of bridges in County 041. The average bridge in Colorado is 0 years old; this one is 68 years old.
Nearby Bridges
I 25 ML SBND over DRAW
Built 1958
I 25 ML NBND over Crooked Canyon Creek
Built 2012
I 25 ML SBND over ROCK CREEK
Built 1958
OLD PUEBLO ROAD over FOUNTAIN CREEK
Built 1989
I 25 ML SBND over DRAW
Built 1958
I 25 ML SBND over DRAW
Built 1958
I 25 ML SBND over DRAW
Built 1958
I 25 ML SBND over DRAW
Built 1958
I 25 ML SBND over DRAW
Built 1958
I 25 ML SBND over DRAW
Built 1958
Bridge Details
- Structure #
- J-18-P
- Year Built
- 1958
- Length
- 65.8 m (215.9 ft)
- Max Span
- 20 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 1,460
- Material
- Concrete Continuous
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $249,000
- Total Project Cost
- $373,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.