I 25 ML SBND over LITTLE FOUNTAIN CREEK

3.8 MI SE OF JCT US 85 · County 041, Colorado · Built 1958 · 2 Lanes · 20,500 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
J-18-AF
Year Built
1958
Length
52.1 m (170.9 ft)
Max Span
16.9 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
20,500
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.