SH 115 ML over ROCK CREEK

5.2 MI S OF ACADEMY BLVD · County 041, Colorado · Built 2022 · 4 Lanes · 13,000 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
J-17-XA
Year Built
2022
Length
33.8 m (110.9 ft)
Max Span
32.3 m
Width
23.5 m (77.1 ft)
Lanes
4
Daily Traffic
13,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$232,000
Total Project Cost
$348,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.