US 40 ML over EUREKA CREEK
5.6 MI NE OF JCT US 87 S · County 017, Colorado · Built 1968 · 2 Lanes · 1,200 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
38.788567, -102.681767
This bridge is in worse condition than 60.7% of bridges in County 017. The average bridge in Colorado is 0 years old; this one is 58 years old.
Bridge Details
- Structure #
- I-26-C
- Year Built
- 1968
- Length
- 24.9 m (81.7 ft)
- Max Span
- 7.9 m
- Width
- 11.7 m (38.4 ft)
- Lanes
- 2
- Daily Traffic
- 1,200
- Material
- Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.