SH 59 ML over BIG SPRING CREEK
7.3 MI NORTH OF JCT US 40 · County 017, Colorado · Built 1966 · 2 Lanes · 460 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
38.90535, -102.796967
This bridge is in worse condition than 45.9% of bridges in County 017. The average bridge in Colorado is 0 years old; this one is 60 years old.
Bridge Details
- Structure #
- I-25-O
- Year Built
- 1966
- Reconstructed
- 1978
- Length
- 20.7 m (67.9 ft)
- Max Span
- 7.9 m
- Width
- 10.5 m (34.4 ft)
- Lanes
- 2
- Daily Traffic
- 460
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.