RAMP TO I 25 NBND over FOUNTAIN CREEK

0.8 MI N. OF JCT I25 · County 041, Colorado · Built 1990 · 2 Lanes · 56,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
I-17-JB
Year Built
1990
Length
287.5 m (943.2 ft)
Max Span
39.8 m
Width
15.2 m (49.9 ft)
Lanes
2
Daily Traffic
56,500
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.