US 24 ML EBND over UNION BLVD
US24 HANCOCK TO QUIVIRA · County 041, Colorado · Built 1993 · 3 Lanes · 21,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
38.811769, -104.789542
This bridge is in worse condition than 60.7% of bridges in County 041. The average bridge in Colorado is 0 years old; this one is 33 years old.
Nearby Bridges
US 24 ML WBND over UNION BLVD
Built 1993
UNION BLVD over SPRING CREEK
Built 1992
US 24 RAMP/UNION over SPRING CREEK R
Built 1995
RAMP TO US24 ML WB over SPRING CREEK
Built 1995
US 24 ML EBND over HANCOCK EXP SPRING CRK
Built 1989
HANCOCK EXPWY EB over SPRING CREEK
Built 1967
HANCOCK EXPWY WB over SPRING CREEK
Built 1967
US 24 ML WBND over HANCOCK EXP SPRING CRK
Built 1989
US 24 ML over SPRING CREEK
Built 1993
LAS VEGAS ST over SPRING CREEK
Built 1981
Bridge Details
- Structure #
- I-17-IY
- Year Built
- 1993
- Length
- 70.9 m (232.6 ft)
- Max Span
- 34.8 m
- Width
- 18 m (59.1 ft)
- Lanes
- 3
- Daily Traffic
- 21,000
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.