US 24 ML EBND over EL PASO BLV FOUNTAIN CRK

IN MANITOU SPRINGS · County 041, Colorado · Built 1969 · 2 Lanes · 13,500 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
I-17-GG
Year Built
1969
Length
62.5 m (205.1 ft)
Max Span
30.2 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
13,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.