US 24 ML over DRAW

1.8 MI E OF FLORISSANT · County 119, Colorado · Built 2023 · 2 Lanes · 5,400 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
I-15-C
Year Built
2023
Length
6.2 m (20.3 ft)
Max Span
2.8 m
Width
18.5 m (60.7 ft)
Lanes
2
Daily Traffic
5,400
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.