US 24 ML over SEASONAL WASH

0.65 MI W OF US285 · County 093, Colorado · Built 2023 · 2 Lanes · 2,200 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
I-13-GA
Year Built
2023
Length
6.8 m (22.3 ft)
Max Span
6.8 m
Width
15.8 m (51.8 ft)
Lanes
2
Daily Traffic
2,200
Material
Aluminum, Wrought Iron, or Cast Iron
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.