COUNTY ROAD 543 over HUERFANO RIVER
0.1 MI S OF GARDNER · County 055, Colorado · Built 2004 · 2 Lanes · 106 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
37.781517, -105.159828
This bridge is in worse condition than 70.2% of bridges in County 055. The average bridge in Colorado is 0 years old; this one is 22 years old.
Nearby Bridges
SH 69 ML over NO NAME WASH
Built 1965
SH 69 ML over WILLIAMS CREEK
Built 1957
COUNTY ROAD 550 over MUDDY CREEK
Built 1987
SH 69 ML over DRAW
Built 1957
SH 69 ML over MILLIGAN ARROYO
Built 2018
SH 69 ML over DRAW
Built 1940
SH 69 ML over DRAW
Built 1957
COUNTY ROAD 540 over HUERFANO RIVER
Built 1991
SH 69 ML over TURKEY CREEK
Built 2012
COUNTY ROAD 634 over CALDWELL GULCH CANYON
Built 1994
Bridge Details
- Structure #
- HU543-S0.1-S69
- Year Built
- 2004
- Length
- 7.4 m (24.3 ft)
- Max Span
- 6.6 m
- Width
- 6.2 m (20.3 ft)
- Lanes
- 2
- Daily Traffic
- 106
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $489,000
- Total Project Cost
- $612,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.