COUNTY ROAD 20 over HENSON CREEK
1.4 MI to ENGINEERS PASS · County 053, Colorado · Built 1986 · 2 Lanes · 142 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 5 | Fair |
Location
37.981931, -107.558297
This bridge is in worse condition than 71.9% of bridges in County 053. The average bridge in Colorado is 0 years old; this one is 40 years old.
Nearby Bridges
US 550 ML NBND over UNCOMPAHGRE RIVER
Built 1976
COUNTY ROAD 20 over NORTH FORK HENSON CREEK
Built 1986
US 550 ML over BEAR CREEK
Built 2010
MTN VILLAGE BLV over PEDESTRIAN
Built 2019
WINDING FDR 855 over PORTLAND CREEK
Built 1958
COUNTY RD 26 (361) over RED MOUNTAIN CREEK
Built 1988
BOX CANYON ROAD over RED MOUNTAIN CREEK
Built 1988
OAK STREET over UNCOMPAHGRE RIVER
Built 1987
BOX CANYON ROAD over RED MOUNTAIN CREEK
Built 1990
7TH AVE over UNCOMPAHGRE RIVER
Built 1992
Bridge Details
- Structure #
- HIN02-15.65A
- Year Built
- 1986
- Length
- 11.4 m (37.4 ft)
- Max Span
- 10.4 m
- Width
- 5.3 m (17.4 ft)
- Lanes
- 2
- Daily Traffic
- 142
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $284,000
- Total Project Cost
- $426,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.