RAMP TO SB I25 over DIRTY WOMAN CREEK R

JUST SOUTH OF SH 105 · County 041, Colorado · Built 2004 · 4 Lanes · 84,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
H-17-BB
Year Built
2004
Length
98.8 m (324.1 ft)
Max Span
40 m
Width
23.1 m (75.8 ft)
Lanes
4
Daily Traffic
84,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.