SH 67 ML over DRAW
3.1 MI N OF JCT SH 24 ML · County 119, Colorado · Built 1939 · 2 Lanes · 3,700 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
39.015814, -105.063736
This bridge is in worse condition than 40.7% of bridges in County 119. The average bridge in Colorado is 0 years old; this one is 87 years old.
Nearby Bridges
SH 67 ML over LOY GULCH
Built 2011
SHERIDAN AVENUE over FOUNTAIN CREEK
Built 1999
ASPEN GARDEN WAY over FOUNTAIN CREEK
Built 1998
SH 67 ML over LONG GULCH CREEK
Built 1939
WOODLAND AVENUE over FOUNTAIN CREEK
Built 1994
SH 67 ML over TROUT CREEK
Built 2000
SH 24 ML over GAME CROSSING
Built 2003
US 24 ML over RULE CREEK
Built 2004
UTE PASS AVENUE over FOUNTAIN CREEK
Built 1968
CHIPITA PARK RD over FOUNTAIN CREEK
Built 2001
Bridge Details
- Structure #
- H-16-L
- Year Built
- 1939
- Length
- 11.5 m (37.7 ft)
- Max Span
- 5.8 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 2
- Daily Traffic
- 3,700
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $167,000
- Total Project Cost
- $251,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.