SH 133 ML over COAL CREEK

AT REDSTONE · County 097, Colorado · Built 1961 · 2 Lanes · 1,800 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
H-08-H
Year Built
1961
Length
29 m (95.1 ft)
Max Span
9.1 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
1,800
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.