I 70 BUS ROUTE over I 70 ML

CLIFTON INTERCHANGE · County 077, Colorado · Built 1964 · 2 Lanes · 15,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
H-03-BD
Year Built
1964
Reconstructed
1978
Length
71.4 m (234.3 ft)
Max Span
22.6 m
Width
16.8 m (55.1 ft)
Lanes
2
Daily Traffic
15,000
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.