CO RD 742 over WILLOW CREEK
AT TAYLOR PARK RESERVOIR · County 051, Colorado · Built 1986 · 2 Lanes · 896 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
38.818142, -106.560672
This bridge is in worse condition than 27.7% of bridges in County 051. The average bridge in Colorado is 0 years old; this one is 40 years old.
Nearby Bridges
Bridge Details
- Structure #
- GUN742-24.00A
- Year Built
- 1986
- Length
- 33.1 m (108.6 ft)
- Max Span
- 12.7 m
- Width
- 10.6 m (34.8 ft)
- Lanes
- 2
- Daily Traffic
- 896
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.