CO RD 25 over LAKE FORK GUNNISON RIVER
22.4 MI SW OF GUNNISON · County 051, Colorado · Built 1987 · 2 Lanes · 124 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
38.326006, -107.227211
This bridge is in worse condition than 27.7% of bridges in County 051. The average bridge in Colorado is 0 years old; this one is 39 years old.
Bridge Details
- Structure #
- GUN025-02.00A
- Year Built
- 1987
- Length
- 15.8 m (51.8 ft)
- Max Span
- 14.9 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 124
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.