CO RD 25 over LAKE FORK GUNNISON RIVER

22.4 MI SW OF GUNNISON · County 051, Colorado · Built 1987 · 2 Lanes · 124 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 6 Satisfactory
Substructure 7 Good

Location

38.326006, -107.227211

This bridge is in worse condition than 27.7% of bridges in County 051. The average bridge in Colorado is 0 years old; this one is 39 years old.

Nearby Bridges

Bridge Details

Structure #
GUN025-02.00A
Year Built
1987
Length
15.8 m (51.8 ft)
Max Span
14.9 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
124
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.