5th Street over Greeley No. 3 Ditch

0.3 MI E of 23rd Ave · County 123, Colorado · Built 1960 · 2 Lanes · 8,191 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
GREELEY-0000006
Year Built
1960
Length
7.1 m (23.3 ft)
Max Span
6.3 m
Width
14.2 m (46.6 ft)
Lanes
2
Daily Traffic
8,191
Material
Prestressed Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.