US 24 ML over I 70 ML
LIMON (EXIT 359) · County 073, Colorado · Built 1975 · 2 Lanes · 7,500 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
39.273422, -103.707172
This bridge is in worse condition than 40.9% of bridges in County 073. The average bridge in Colorado is 0 years old; this one is 51 years old.
Nearby Bridges
US 24 ML over UP RR
Built 2000
US 24 ML over BIG SANDY CREEK
Built 2000
SH 71 ML over BIG SANDY CREEK
Built 1999
US 24 ML over DRAW
Built 1934
SH 71 ML over I 70 ML
Built 1975
I 70 FRONTAGE RD over DRAW SR
Built 1934
SH 71 ML over SANDY CREEK
Built 1984
I 70 ML EBND over DRAW
Built 1958
I 70 ML WBND over DRAW
Built 1972
I 70 ML EBND over US 24 ML
Built 1975
Bridge Details
- Structure #
- G-22-BA
- Year Built
- 1975
- Length
- 66.6 m (218.5 ft)
- Max Span
- 32.9 m
- Width
- 14.2 m (46.6 ft)
- Lanes
- 2
- Daily Traffic
- 7,500
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.