SH 86B ML over I 25 ML
JCT I25 · County 035, Colorado · Built 1999 · 7 Lanes · 36,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
39.412758, -104.867939
This bridge is in worse condition than 64.8% of bridges in County 035. The average bridge in Colorado is 0 years old; this one is 27 years old.
Nearby Bridges
WB MEADOWS PARKWAY over PED PATH | EAST PLUM CRE
Built 1987
EB MEADOWS PARKWAY over EAST PLUM CREEK | RAILRO
Built 1987
MEADOWS BLVD over EAST PLUM CREEK TRIBUTAR
Built 1986
NB I25 ML over N MEADOWS PARKWAY
Built 2015
SB I25 ML over N MEADOWS PARKWAY
Built 2015
SANTA FE DRIVE over I25 ML
Built 2002
NB US 85 OFF RAMP over TERRAIN
Built 2014
SB US 85 ON RAMP over TERRAIN
Built 2014
TIMBER MILL PARKWA over EAST PLUM CREEK
Built 2022
SABERCAT WAY over EAST PLUM CREEK TRIBUTAR
Built 2007
Bridge Details
- Structure #
- G-17-AM
- Year Built
- 1999
- Length
- 70.7 m (232 ft)
- Max Span
- 35 m
- Width
- 34.8 m (114.2 ft)
- Lanes
- 7
- Daily Traffic
- 36,000
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.