14th Street over Platteville Ditch

0.3 Mi W of US Hwy 85 · County 123, Colorado · Built 1994 · 2 Lanes · 996 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
FTL14TH-FULTONA
Year Built
1994
Length
10.8 m (35.4 ft)
Max Span
9.7 m
Width
11.7 m (38.4 ft)
Lanes
2
Daily Traffic
996
Material
Prestressed Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.