FIRESTONE BLVD. over GODDING HOLLOW
0.1 mi W of CR 111 · County 123, Colorado · Built 2020 · 4 Lanes · 24,922 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
40.160758, -104.96305
This bridge is in worse condition than 19.4% of bridges in County 123. The average bridge in Colorado is 0 years old; this one is 6 years old.
Nearby Bridges
I 25 ML NBND over SH 119 ML
Built 1998
I 25 ML SBND over SH 119 ML
Built 1998
County Road 9.5 over St Vrain River
Built 1999
I 25 ML NBND over ST VRAIN RIVER
Built 2008
I-25 ML SBND over St. VRAIN RIVER
Built 2008
County Road 13 over St. Vrain Creek
Built 2004
I-25 ML NB over COUNTY ROAD 28
Built 2008
I-25 ML SBND over COUNTY ROAD 28
Built 2008
I 25 ML NBND over WELD COUNTY ROAD 20
Built 2006
I 25 ML SBND over WELD COUNTY ROAD 20
Built 2006
Bridge Details
- Structure #
- FRSTN-FIRBLVDGH
- Year Built
- 2020
- Length
- 20.6 m (67.6 ft)
- Max Span
- 3.9 m
- Width
- 40.1 m (131.6 ft)
- Lanes
- 4
- Daily Traffic
- 24,922
- Material
- Concrete
- Design
- Culvert
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.