County Road 16 over Godding Hollow Ditch
0.5 mi E of I-25 · County 123, Colorado · Built 2017 · 3 Lanes · 2,907 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
40.102406, -104.968033
This bridge is in worse condition than 19.4% of bridges in County 123. The average bridge in Colorado is 0 years old; this one is 9 years old.
Nearby Bridges
I 25 ML AND FR RDS over LOWER BOULDER DITCH
Built 2000
TIPPLE PKWY/CO16 over LOWER BOULDER DITCH
Built 2012
County Road 11 over Sullivan Ditch
Built 2004
I25 SERVICE ROAD over CHANNEL MD-B SR
Built 2000
I 25 ML & Ramps over CHANNEL MD-B
Built 2000
County Road 18 over Local Drainage
Built 2015
SH 52 ML over LOWER BOULDER DITCH
Built 1960
SH 52 ML over SULLIVAN CANAL
Built 1960
I25 W FRONTAGE RD. over CHANNEL MD-B SR
Built 2000
SH 52 ML over I 25 ML
Built 1999
Bridge Details
- Structure #
- FRD016.0-011.0
- Year Built
- 2017
- Length
- 14.6 m (47.9 ft)
- Max Span
- 4.7 m
- Width
- 27.7 m (90.9 ft)
- Lanes
- 3
- Daily Traffic
- 2,907
- Material
- Concrete
- Design
- Culvert
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.