CR19 / BEAR PAW over HARDSCRABBLE CREEK
5 MI SE OF SH 67 · County 043, Colorado · Built 1995 · 2 Lanes · 100 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
38.343136, -105.068422
This bridge is in worse condition than 92% of bridges in County 043. The average bridge in Colorado is 0 years old; this one is 31 years old.
Nearby Bridges
SH 67 ML over NEWLIN CREEK
Built 2000
SH 120 ML over DRAW UP RR
Built 2015
SH 120 ML over COCKELBURR CREEK
Built 1930
SH 67 ML over DRAW
Built 2013
SH 67 ML over DRAW
Built 2000
SH 67 ML over ADOBE CREEK
Built 2000
SH 115 ML over ARKANSAS RIVER
Built 1951
COUNTY ROAD 95 over SECOND ALKALI CREEK
Built 2007
COUNTY ROAD 106 over HARDSCRABBLE CREEK
Built 1988
RAILROAD STREET over COAL CREEK
Built 1918
Bridge Details
- Structure #
- FRCO 19-209A
- Year Built
- 1995
- Length
- 24.3 m (79.7 ft)
- Max Span
- 22.8 m
- Width
- 7.6 m (24.9 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $650,000
- Total Project Cost
- $974,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.