SOUTHMOOR DRIVE over CRUSE GULCH

.3 MI NW OF SH85/16 INTER · County 041, Colorado · Built 1990 · 2 Lanes · 939 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
FOUNTAIN-1A
Year Built
1990
Length
16.4 m (53.8 ft)
Max Span
6.1 m
Width
10.3 m (33.8 ft)
Lanes
2
Daily Traffic
939
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.