Elizabeth Street over Larimer Co. Canal No. 2

200 Ft E of Bryan Ave · County 069, Colorado · Built 1960 · 3 Lanes · 12,803 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
FCELIZ-0.1-BRYN
Year Built
1960
Length
6.7 m (22 ft)
Max Span
6.2 m
Width
21.3 m (69.9 ft)
Lanes
3
Daily Traffic
12,803
Material
Prestressed Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$175,000
Total Project Cost
$193,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.