I 70 ML EBND over WEST BIJOU CREEK

5.3 MI E OF STRASBURG SPU · County 005, Colorado · Built 1993 · 3 Lanes · 7,500 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
F-20-BX
Year Built
1993
Length
196.3 m (644 ft)
Max Span
39 m
Width
14.8 m (48.6 ft)
Lanes
3
Daily Traffic
7,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.