US 36 ML over DRAW

0.5 MI E OF JCT I 70 · County 005, Colorado · Built 2022 · 2 Lanes · 3,500 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
F-19-EA
Year Built
2022
Length
16.8 m (55.1 ft)
Max Span
15.8 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
3,500
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,048,000
Total Project Cost
$2,561,000