EVANS AVE. over I 25 ML

IN DENVER · County 031, Colorado · Built 2004 · 8 Lanes · 24,019 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
F-17-NS
Year Built
2004
Length
74.9 m (245.7 ft)
Max Span
29.2 m
Width
42.5 m (139.4 ft)
Lanes
8
Daily Traffic
24,019
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.