SH 88 ML/ARAP RD over DRAW
1.48 MI E OF JCT I25 · County 005, Colorado · Built 1976 · 7 Lanes · 57,000 vehicles/day
Overall
Culvert
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 5 | Fair |
Location
39.594953, -104.859608
This bridge is in worse condition than 75.8% of bridges in County 005. The average bridge in Colorado is 0 years old; this one is 50 years old.
Nearby Bridges
BRIARWOOD AVE over COTTONWOOD CREEK
Built 1988
PEAKVIEW AVENUE over COTTONWOOD CREEK
Built 1984
BRIARWOOD AVENUE over COTTONWOOD CREEK TRIB
Built 1985
CALEY AVENUE over COTTONWOOD CREEK
Built 1986
EASTER AVE over COTTONWOOD CREEK
Built 1988
JOLIET ST over COTTONWOOD CREEK TRIB.
Built 1989
PEORIA STREET over COTTONWOOD CREEK
Built 2002
INVERNESS DR E. over COTTONWOOD CREEK
Built 1978
INVERNESS DR EAST over COTTONWOOD CREEK
Built 1974
SH 88 ML(ARAP. RD) over WINDMILL CREEK
Built 1981
Bridge Details
- Structure #
- F-17-LW
- Year Built
- 1976
- Reconstructed
- 1983
- Length
- 9.9 m (32.5 ft)
- Max Span
- 3.7 m
- Width
- 46.8 m (153.5 ft)
- Lanes
- 7
- Daily Traffic
- 57,000
- Material
- Concrete
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.