SH 88 ML/ARAP RD over DRAW

1.48 MI E OF JCT I25 · County 005, Colorado · Built 1976 · 7 Lanes · 57,000 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
F-17-LW
Year Built
1976
Reconstructed
1983
Length
9.9 m (32.5 ft)
Max Span
3.7 m
Width
46.8 m (153.5 ft)
Lanes
7
Daily Traffic
57,000
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.