SH 470 ML WBND over BIG DRY CREEK

3.2 M W OF JCT I25 · County 035, Colorado · Built 1984 · 5 Lanes · 49,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
F-17-HT
Year Built
1984
Length
39.8 m (130.6 ft)
Max Span
39 m
Width
23.5 m (77.1 ft)
Lanes
5
Daily Traffic
49,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.