US 40 ML EBND over HIGHLINE CANAL

1.7 E OF I225 · County 005, Colorado · Built 1935 · 2 Lanes · 10,500 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
F-17-D
Year Built
1935
Reconstructed
1967
Length
8.9 m (29.2 ft)
Max Span
8 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
10,500
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.