SH 470 ML WBND over US 285 ML

2 MI S OF MORRISON · County 059, Colorado · Built 1988 · 3 Lanes · 33,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
F-16-MY
Year Built
1988
Length
92.7 m (304.1 ft)
Max Span
38 m
Width
15.7 m (51.5 ft)
Lanes
3
Daily Traffic
33,000
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.