US 285 ML over CONIFER ROAD
2 MI NE OF CONIFER · County 059, Colorado · Built 2002 · 6 Lanes · 23,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
39.542919, -105.291181
This bridge is in worse condition than 40.6% of bridges in County 059. The average bridge in Colorado is 0 years old; this one is 24 years old.
Nearby Bridges
WOLFF AVE over US 285 ML
Built 2003
US 285 ML over NORTH ACCESS ROAD
Built 2002
CONIFR.TWN.CNTR.DR over SH 285 ML
Built 2005
US 285 ML over PLEASANT PARK RD.
Built 2003
US 285 ML over KENNEDY GULCH RD
Built 2002
COUNTY ROAD 122 over SOUTH TURKEY CREEK
Built 1991
COUNTY ROAD 64 over PRIVATE DRIVE
Built 1995
COUNTY ROAD 122 over SOUTH TURKEY CREEK
Built 1999
US 285 ML over WILDLIFE CROSSING
Built 2009
COUNTY ROAD 64 | N over NORTH TURKEY CREEK
Built 1973
Bridge Details
- Structure #
- F-15-DG
- Year Built
- 2002
- Length
- 22.7 m (74.5 ft)
- Max Span
- 21.9 m
- Width
- 35.5 m (116.5 ft)
- Lanes
- 6
- Daily Traffic
- 23,000
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $800,000
- Total Project Cost
- $1,200,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.