SH 9 ML over BLUE RIVER

IN SILVERTHORNE · County 117, Colorado · Built 1982 · 5 Lanes · 20,000 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
F-12-BP
Year Built
1982
Length
21 m (68.9 ft)
Max Span
4.3 m
Width
42.1 m (138.1 ft)
Lanes
5
Daily Traffic
20,000
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.