I 70 ML WBND over US 6 RR EAGLE RIVER

2.2 MI E OF JCT US 24 · County 037, Colorado · Built 1972 · 2 Lanes · 19,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
F-11-AB
Year Built
1972
Length
199.4 m (654.2 ft)
Max Span
47.9 m
Width
12.3 m (40.4 ft)
Lanes
2
Daily Traffic
19,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,196,000
Total Project Cost
$6,294,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.