I 70 ML EBND over COLORADO RIVER
JUST E. OF GLENWOOD CANYO · County 037, Colorado · Built 1980 · 2 Lanes · 8,500 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
7
Good
Superstructure
3
Serious
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 3 | Serious |
| Substructure | 7 | Good |
Location
39.648333, -107.062372
This bridge is in worse condition than 98.8% of bridges in County 037. The average bridge in Colorado is 0 years old; this one is 46 years old.
Nearby Bridges
I 70 ML WBND over COLORADO RIVER
Built 1980
I 70 SERVICE RD SR over COLORADO RIVER SR
Built 2013
I 70 ML EBND over SWEETWATER CROSS ROAD
Built 1980
I 70 ML WBND over SWEETWATER CROSS ROAD
Built 1980
I 70 FRONTAGE SR over UP RR SR
Built 1935
I 70 ML WBND over UP RR
Built 1980
I 70 ML EBND over UP RR
Built 1980
I 70 FRONTAGE over DRAW SR
Built 1935
I 70 ML WBND over DOTSERO EAST CROSS ROAD
Built 1980
I 70 ML EBND over DOTSERO EAST CROSS ROAD
Built 1980
Bridge Details
- Structure #
- F-08-Q
- Year Built
- 1980
- Length
- 134.2 m (440.3 ft)
- Max Span
- 38.1 m
- Width
- 13.5 m (44.3 ft)
- Lanes
- 2
- Daily Traffic
- 8,500
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $6,472,000
- Total Project Cost
- $9,708,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.