I 70 ML EBND over DRY CREEK

2.5 Mi E of RIFLE · County 045, Colorado · Built 1975 · 2 Lanes · 10,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
F-06-AA
Year Built
1975
Length
25.1 m (82.3 ft)
Max Span
24.4 m
Width
13.6 m (44.6 ft)
Lanes
2
Daily Traffic
10,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.