ACADEMY BLVD SB over BRADLEY ROAD

1 MI. E. OF I25 · County 041, Colorado · Built 1974 · 3 Lanes · 27,373 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
9
Excellent

Bridge Details

Structure #
EPC4099-02.98L
Year Built
1974
Length
56.3 m (184.7 ft)
Max Span
23.6 m
Width
13.6 m (44.6 ft)
Lanes
3
Daily Traffic
27,373
Material
Concrete Continuous
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$679,000
Total Project Cost
$747,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.