LAMBERT DR over UNKNOWN DRAINAGE
0.2 MI S OF STAPLETON · County 041, Colorado · Built 2011 · 2 Lanes · 768 vehicles/day
Overall
Culvert
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 8 | Very Good |
Location
38.966942, -104.588331
This bridge is in worse condition than 38.5% of bridges in County 041. The average bridge in Colorado is 0 years old; this one is 15 years old.
Nearby Bridges
EASTONVILLE ROAD over SQUIRREL CREEK TRIBUTARY
Built 2004
MERIDIAN RANCH BLV over SQUIRREL CREEK TRIBUTARY
Built 2002
JUDGE ORR RD over BLK SQUIRREL CRK TRIB
Built 2019
EB LONDONDERRY DR over SQUIRREL CREEK TRIBUTARY
Built 2002
WB LONDONDERRY DR over SQUIRREL CREEK TRIBUTARY
Built 2002
STAPLETON ROAD over BLK SQUIRREL CRK TRIB
Built 2019
US 24 ML over DRAW
Built 2010
EB LONDONDERRY DR over SQUIRREL CREEK TRIBUTARY
Built 2002
WB LONDONDERRY DR over SQUIRREL CREEK TRIBUTARY
Built 2002
BLUE GILL DR over UNKNOWN DRAINAGE
Built 2012
Bridge Details
- Structure #
- EPC3271-00.71
- Year Built
- 2011
- Length
- 9.4 m (30.8 ft)
- Max Span
- 2.5 m
- Width
- 38.3 m (125.7 ft)
- Lanes
- 2
- Daily Traffic
- 768
- Material
- Concrete
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.