CAPITAL DRIVE over EAST FORK SAND CREEK

JUST E OF RIVERWALK PKWY · County 041, Colorado · Built 2003 · 2 Lanes · 1,234 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
EPC2633-00.36
Year Built
2003
Length
13.3 m (43.6 ft)
Max Span
4.3 m
Width
15 m (49.2 ft)
Lanes
2
Daily Traffic
1,234
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.